Y
YUDI.MFG Factory Direct
Get Quote
How to Order Custom Lanyards with MOQ 50 (2026 Guide)
Buying Guide 8 min read · 2026-06-01

How to Order Custom Lanyards with MOQ 50 (2026 Guide)

Most factories require 500-1000 pcs MOQ for custom lanyards. Here's how to get full-color sublimation lanyards at MOQ 50 — directly from a Dongguan factory, without inflated middleman prices.

Why Most Factories Quote 500-1000 pcs Minimum

When you contact a typical lanyard manufacturer in China, the first MOQ quote you'll hear is 500 to 1000 pieces. This is not because of malice — it's because of how their production lines are set up. Setup time for a single color print run takes 30-45 minutes regardless of whether you're producing 100 or 10,000 pieces. To make small orders profitable, most factories simply refuse them or apply a 3-4x price premium.

When MOQ 50 Custom Lanyards Make Business Sense

Ordering 50 lanyards is the right choice in these scenarios:

Yudi's MOQ 50 Process — What's Different

Yudi Mfg has invested in dual-line sublimation printers that allow short runs without the 30-minute setup penalty. This means we can take orders as small as 50 pieces with full-color sublimation print, no setup fee, and competitive per-unit pricing.

Realistic Pricing at MOQ 50

StyleMOQUnit Price (USD)Lead Time
Sublimation print (full color)50 pcs$2.20 - $3.50Sample 5 days + Production 12 days
Silkscreen (1-2 colors)100 pcs$1.60 - $2.40Sample 5 days + Production 10 days
Woven jacquard (premium)200 pcs$2.80 - $4.20Sample 7 days + Production 15 days
Double-layer (luxury)200 pcs$3.50 - $5.00Sample 7 days + Production 18 days

What to Send Us for a Quote

  1. Artwork file (AI/PDF/PNG — vector preferred)
  2. Pantone color codes if matching brand colors
  3. Quantity (you can ask for 50, 100, 200, 500 quotes in one go)
  4. Width preference (10mm, 15mm, 20mm, or 25mm)
  5. Hardware preference (plastic clip free, metal clip +$0.15, swivel hook +$0.20)
  6. Delivery deadline and shipping destination

Frequently Asked Questions

Frequently Asked Questions

Is there a setup or mold fee for MOQ 50? +
No setup fee, no mold fee for sublimation, silkscreen, or heat transfer. Woven and double-layer require a one-time setup of $50-80 which is waived on orders over 500 pcs.
How is the per-unit price at 50 pcs compared to 500 pcs? +
At 50 pcs, expect roughly 2x the per-unit price of a 500 pcs order. So if 500 pcs costs $1.20 each, 50 pcs costs about $2.40 each. Volume discount kicks in at 200, 500, 2000, and 10000 thresholds.
Do you ship MOQ 50 orders via air? +
Yes. DHL or FedEx air freight is recommended at MOQ 50 because the freight cost is reasonable ($30-60 for 50 lanyards to USA/EU). Sea freight is not cost-effective at this volume.
Can I mix designs in a 50-piece order? +
Yes, but each unique design counts as a separate setup. We recommend a single design for MOQ 50. For 2-3 designs, MOQ goes to 100 pcs total.
How fast can I get the lanyards? +
Total timeline at MOQ 50: 1 day quote + 5 days sample (optional) + 12 days production + 5 days air shipping = 18-23 days door-to-door. Express rush available with surcharge.

More Reading

Other Buying Guides

Request a Quote

Ready to Start?

Tell us about your project. We'll respond with a free mockup and quote within 24 hours.

Chat on WhatsApp